Home > Schedule Settings > Basic Schedule Settings > Add a Week to Base Date > Configuring an Additional Week to the Base Date
Configuring an Additional Week to the Base Date

To add a Week to the Base Date:

  1. Select Schedule Settings in the Main window.

    Figure 5-53 Main Window

    images/1_Main00107_1.gif 

    The Schedule Settings pane of the Main window opens.

    Figure 5-54 Main Window

    images/2_Schedule_Settings00108_1.gif 

  2. Select the Basic Schedule Settings field in the Schedule Settings window.

    Figure 5-55 Main Window

    images/3_Basic_Schedule_Settings00109_1.gif 

    The Basic Schedule Settings pane opens.

    Figure 5-56 Basic Schedule Settings Window

    images/4_Basic_Schedule_Settings_Window00110_1.gif 

  3. Select the arrow in the Assigning Time Period field.

    Figure 5-57 Basic Schedule Settings Window

    images/15_Assign_Time00111_1.gif 

    The Assigning Time Period dropdown menu opens.

    Figure 5-58 Basic Schedule Settings Window

    images/16_Assign_Time_Dropdown00112_1.gif 

  4. Select the required Time Period value from the Assigning Time Period dropdown menu.

    NOTE: The 2 weeks and monthly values are available in the Pro version only).

  5. Check the box in the Add a Week to Base Date field.

    Figure 5-59 Basic Schedule Settings Window

    images/22_Add_Base_Date_1.gif 

    The selected Time Period value is added to the Schedules Cycle.

  6. Scroll down the Basic Schedule Settings window and select Save.

The configuration is saved, and the Data Successfully Saved message appears at the bottom of the Basic Schedule Settings window.



See also:

Modifying an Additional Week to the Base Date Configuration
Deleting an Additional Week to the Base Date Configuration