Home > Schedule Settings > Basic Schedule Settings > Default View Type > Configuring the Schedule Default View Type
Configuring the Schedule Default View Type

To configure the Schedule Default View Type:

  1. Select Schedule Settings in the Main window.

    Figure 5-70 Main Window

    images/1_Main00121_1.gif 

    The Schedule Settings pane of the Main window opens.

    Figure 5-71 Main Window

    images/2_Schedule_Settings00122_1.gif 

  2. Select the Basic Schedule Settings field in the Schedule Settings pane.

    Figure 5-72 Main Window

    images/3_Basic_Schedule_Settings00123_1.gif 

    The Basic Schedule Settings window opens.

    Figure 5-73 Basic Schedule Settings Window

    images/4_Basic_Schedule_Settings_Window00124_1.gif 

  3. Select the arrow in the Default View Type field.

    Figure 5-74 Basic Schedule Settings Window

    images/25_Default_View_1.gif 

    The Default View Type dropdown menu opens.

    Figure 5-75 Basic Schedule Settings Window

    images/26_Default_View_Dropdown_1.gif 

  4. Select the required Default View Type value from the Default View Type dropdown menu.

  5. Scroll down the Basic Schedule Settings window and select Save.

The configuration is saved, and the Data Successfully Saved message appears at the bottom of the Basic Schedule Settings window.



See also:

Modifying the Schedule Default View Type
Deleting the Schedule Default View Type